Now we make delivery of components (covers and bottoms) to one of the largest fermenters in Russia.
product delivery is a complex technical process due to the size of the cargo
The size of one of the largest elements is 6.3 m in diameter.
The loading of cargo in China
The loading of cargo in China
The loading of cargo in China

July 2019

"Ladesol-Tambov" is actively engaged in the manufacture and supply of equipment to the plant
Mark Faider and italian partner team

May - June 2019

"Ladesol-Tambov" is actively engaged in the manufacture and supply of equipment to the plant

March 2019

Repair and restoration works of the slabs of the Administrative building of the Plant are in progress.
The installation of the sandwich panels of the main building ends.

February 2019

On the Administrative building began repair work slabs.
The installation of the sandwich panels of the main workshop of the Plant
Appearance of one of the walls of the main workshop building
On one of the walls of the workshop, openings are being prepared for the installation of window blocks.
Work began on the repair of the brick wall of the administrative building of the Plant.

January 2019

Roofing and repair works are carried out on the building of the main workshop of the Plant.
The installation of the roof covering began on the building of the main workshop of the Plant.
On the roof of the main workshop is mounted a room for ventilation equipment.
Completed installation of metal supply ventilation. cameras on the roof of the main building

November - December 2018

A new roof is being installed on the building of the main workshop of the Plant.
Type of workshop of the plant, installation work is underway on a new roof.
The main workshop building was prepared for the installation of metal roofing.
Work continues on the installation of a new roof for the main workshop of the Plant.

May - June 2018

Administrative building after dismantling
Dismantling and strengthening of the farm after dismantling.
Reinforced reinforced concrete trusses after dismantling.
The building of the administrative building after the dismantling.

September 2017

View of the building of the Administrative building before dismantling
View of the building of the main workshop of the Plant before the dismantling works.
The main building of the Plant is ready for dismantling.
View of the administrative building and the main shop of the Plant.
View of the main plant shop. Before starting dismantling
The main workshop of the Plant before the dismantling works.